Assessment Year | 1983 |
---|---|
Principal Product | CUSTOM MOLDINGS |
NAICS |
n/a
|
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $1 M to 5M |
# of Employees | 55 |
Plant Area |
n/a
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,048
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,722 | 1,364,302 |
kWh
|
$0.056 |
Natural Gas | $4,465 | 878 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $814 | $862 |
$814
14,654
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,030 | $100 |
$1,030
18,464
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $115 | $180 | - |
$295
-
MMBtu
|
$(-180.0) | |
05 | 2.1123: Install automatic stack damper | $335 | $450 | - |
$335
-
MMBtu
|
- | |
06 | 2.6214: Shut off pilots in standby equipment | $85 | - | - |
$85
-
MMBtu
|
- | |
07 | 2.7261: Install timers and/or thermostats | $1,466 | $89 |
$163
2,931
kWh
|
$1,303
-
MMBtu
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,369 | $200 | - |
$1,369
-
MMBtu
|
- | |
09 | 2.6121: Reduce hot water temperature to the minimum required | $81 | - | - |
$81
-
MMBtu
|
- | |
10 | 2.2511: Insulate bare equipment | $4,862 | $2,500 |
$4,862
87,632
kWh
|
- | - | |
TOTAL RECOMMENDED | $10,157 | $4,381 |
$6,869
123,681
kWh
|
$3,468
-
MMBtu
|
$(-180.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs