ITAC Assessment: KU0095
ITAC logo
ITAC Assessment: KU0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product KITCHEN APPLIANCES
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,439 1,083,236
kWh
Natural Gas $40,875 9,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,354 $2,809 $5,354
75,909
kWh
-
02 2.7261: Install timers and/or thermostats $1,064 $1,400 - $1,064
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,017 $1,230 - $3,017
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $878 $4,000 $(-310.0)
(-4,396)
kWh
$1,188
-
MMBtu
05 2.3191: Use demand controller or load shedder $1,846 $2,000 $1,846
-
kWh
-
06 2.1123: Install automatic stack damper $1,323 $1,400 - $1,323
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $925 $378 - $925
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $682 $120 $682
9,672
kWh
-
09 2.2212: Use minimum safe oven ventilation $629 $200 - $629
-
MMBtu
10 2.4231: Reduce the pressure of compressed air to the minimum required $127 - $127
1,758
kWh
-
TOTAL RECOMMENDED $15,845 $13,537 $7,699
82,943
kWh
$8,146
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs