| Assessment Year | 1983 |
|---|---|
| Principal Product | PLASTIC BOTTLES |
| NAICS |
n/a
|
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 48,000,000
pieces
|
| Production Hrs. Annual | 6,024
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $294,080 | 4,790,739 |
kWh
|
$0.061 |
| Natural Gas | $18,392 | 3,606 |
MMBtu
|
$5.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,400 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $3,596 | $800 | - |
$3,596
-
MMBtu
|
|
| 02 | 2.1231: Establish burner maintenance schedule for boilers | $1,270 | $360 | - |
$1,270
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,187 | $715 |
$1,187
19,343
kWh
|
- | |
| 04 | 2.1123: Install automatic stack damper | $1,127 | $1,200 | - |
$1,127
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $953 | $300 |
$953
15,533
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,925 | $240 |
$1,925
31,360
kWh
|
- | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $342 | - |
$342
5,569
kWh
|
- | |
| TOTAL RECOMMENDED | $10,400 | $3,615 |
$4,407
71,805
kWh
|
$5,993
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,400 | $3,615 |
$4,407
71,805
kWh
|
$5,993
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs