Assessment Year | 1996 |
---|---|
Principal Product | residential roofing |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
135,300
ft2
|
Annual Production | 150,000
ton
|
Production Hrs. Annual | 8,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,798 | 5,751,172 |
kWh
|
$0.027 |
Electricity Demand | $130,643 | 10,788 |
kW-mo/yr
|
$12.11 |
Natural Gas | $271,801 | 109,909 |
MMBtu
|
$2.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,101 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1232: Keep boiler tubes clean | $2,375 | $500 | - | - |
$2,375
-
MMBtu
|
- | - | - | - | |
02 | 2.2113: Repair or replace steam traps | $10,368 | $9,000 | - | - |
$4,168
-
MMBtu
|
- |
$6,200
-
gal
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $14,952 | $2,500 |
$6,248
297,479
kWh
|
$6,579
-
kW-mo/yr
|
- | - | - | - | $2,125 | |
04 | 2.7134: Use photocell controls | $1,741 | $1,375 |
$445
21,102
kWh
|
$1,026
-
kW-mo/yr
|
- | - | - | $270 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,907 | $15,000 |
$2,088
99,355
kWh
|
$2,199
-
kW-mo/yr
|
- | - | - | $620 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,431 | $5,975 |
$1,018
48,359
kWh
|
$1,078
-
kW-mo/yr
|
- | - | - | $335 | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,554 | $5,953 |
$797
38,101
kWh
|
$1,757
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 3.4114: Replace city water with recycled water via cooling tower | $11,264 | $45,000 |
$(-1,940.0)
(-92,321)
kWh
|
$(-2,256.0)
-
kW-mo/yr
|
- |
$15,960
-
Tgal
|
- | $(-500.0) | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $14,773 | $34,000 |
$(-563.0)
(-25,498)
kWh
|
$(-564.0)
-
kW-mo/yr
|
- |
$18,900
-
Tgal
|
- | $(-3,000.0) | - | |
TOTAL RECOMMENDED | $65,365 | $119,303 |
$8,093
386,577
kWh
|
$9,819
-
kW-mo/yr
|
$6,543
-
MMBtu
|
$34,860
-
Tgal
|
$6,200
-
gal
|
$(-2,275.0) | $2,125 | ||
TOTAL IMPLEMENTED | $54,101 | $74,303 |
$10,033
478,898
kWh
|
$12,075
-
kW-mo/yr
|
$6,543
-
MMBtu
|
$18,900
-
Tgal
|
$6,200
-
gal
|
$(-1,775.0) | $2,125 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs