ITAC Assessment: UD0493
ITAC logo
ITAC Assessment: UD0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product residential roofing
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 135,300
ft2
Annual Production 150,000
ton
Production Hrs. Annual 8,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,798 5,751,172
kWh
Electricity Demand $130,643 10,788
kW-mo/yr
Natural Gas $271,801 109,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1232: Keep boiler tubes clean $2,375 $500 - - $2,375
-
MMBtu
- - - -
02 2.2113: Repair or replace steam traps $10,368 $9,000 - - $4,168
-
MMBtu
- $6,200
-
gal
- -
03 2.4239: Eliminate or reduce compressed air usage $14,952 $2,500 $6,248
297,479
kWh
$6,579
-
kW-mo/yr
- - - - $2,125
04 2.7134: Use photocell controls $1,741 $1,375 $445
21,102
kWh
$1,026
-
kW-mo/yr
- - - $270 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,907 $15,000 $2,088
99,355
kWh
$2,199
-
kW-mo/yr
- - - $620 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,431 $5,975 $1,018
48,359
kWh
$1,078
-
kW-mo/yr
- - - $335 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,554 $5,953 $797
38,101
kWh
$1,757
-
kW-mo/yr
- - - - -
08 3.4114: Replace city water with recycled water via cooling tower $11,264 $45,000 $(-1,940.0)
(-92,321)
kWh
$(-2,256.0)
-
kW-mo/yr
- $15,960
-
Tgal
- $(-500.0) -
09 3.4111: Use closed cycle process to minimize waste water production $14,773 $34,000 $(-563.0)
(-25,498)
kWh
$(-564.0)
-
kW-mo/yr
- $18,900
-
Tgal
- $(-3,000.0) -
TOTAL RECOMMENDED $65,365 $119,303 $8,093
386,577
kWh
$9,819
-
kW-mo/yr
$6,543
-
MMBtu
$34,860
-
Tgal
$6,200
-
gal
$(-2,275.0) $2,125
TOTAL IMPLEMENTED $54,101 $74,303 $10,033
478,898
kWh
$12,075
-
kW-mo/yr
$6,543
-
MMBtu
$18,900
-
Tgal
$6,200
-
gal
$(-1,775.0) $2,125
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs