ITAC Assessment: UM0219
ITAC logo
ITAC Assessment: UM0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aerospace electronics, indicators for cockpits and flap position sensors
NAICS
n/a
SIC 3826: Laboratory Analytical Instruments
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 66,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,725 3,191,569
kWh
Electricity Demand $81,852 7,180
kW-mo/yr
Electricity Fees $2,473 -
Natural Gas $18,965 3,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $78,674 $26,400 n/a $54,191
1,328,868
kWh
$24,483
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $25,965 $62,826 $11,273
276,432
kWh
$12,120
-
kW-mo/yr
- $2,572
-
lb
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $283 $225 $184
4,514
kWh
$99
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $431 $600 $280
6,869
kWh
$151
-
kW-mo/yr
- - -
05 2.6218: Turn off equipment when not in use $1,258 $800 $1,258
16,480
kWh
- - - -
06 2.1224: Replace boiler $3,920 $12,000 - - $3,920
-
MMBtu
- -
07 3.4115: Recover and reuse cooling water $8,640 $5,940 - - - - $8,640
-
Tgal
TOTAL RECOMMENDED $119,171 $108,791 $67,186
1,633,163
kWh
$36,853
-
kW-mo/yr
$3,920
-
MMBtu
$2,572
-
lb
$8,640
-
Tgal
TOTAL IMPLEMENTED $40,066 $81,791 $12,715
297,426
kWh
$12,219
-
kW-mo/yr
$3,920
-
MMBtu
$2,572
-
lb
$8,640
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs