| Assessment Year | 1983 |
|---|---|
| Principal Product | CANNED PORK & BEANS |
| NAICS |
n/a
|
| SIC | 2032: Canned Specialties |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 4,252
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $75,086 | 1,879,836 |
kWh
|
$0.040 |
| Natural Gas | $467,298 | 120,906 |
MMBtu
|
$3.86 |
| Fuel Oil #4 | $32,996 | 4,612 |
MMBtu
|
$7.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $218,509 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $206,013 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,553 | $21,306 |
$10,553
264,361
kWh
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $14,849 | $9,478 | - |
$14,849
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $7,806 | $4,800 | - |
$7,806
-
MMBtu
|
|
| 04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $13,011 | $11,400 | - |
$13,011
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $105,477 | $25,000 | - |
$105,477
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $2,958 | $4,861 | - |
$2,958
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $51,359 | $2,500 | - |
$51,359
-
MMBtu
|
|
| 08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $6,788 | $10,000 | - |
$6,788
-
MMBtu
|
|
| 09 | 2.2163: Use minimum steam operating pressure | $5,708 | - | - |
$5,708
-
MMBtu
|
|
| TOTAL RECOMMENDED | $218,509 | $89,345 |
$10,553
264,361
kWh
|
$207,956
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $206,013 | $79,345 |
$10,553
264,361
kWh
|
$195,460
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs