ITAC Assessment: KU0085
ITAC logo
ITAC Assessment: KU0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CANNED PORK & BEANS
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,252
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,086 1,879,836
kWh
Natural Gas $467,298 120,906
MMBtu
Fuel Oil #4 $32,996 4,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $218,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,553 $21,306 $10,553
264,361
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $14,849 $9,478 - $14,849
-
MMBtu
03 2.7261: Install timers and/or thermostats $7,806 $4,800 - $7,806
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $13,011 $11,400 - $13,011
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $105,477 $25,000 - $105,477
-
MMBtu
06 2.2511: Insulate bare equipment $2,958 $4,861 - $2,958
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $51,359 $2,500 - $51,359
-
MMBtu
08 2.1243: Use heat from boiler blowdown to preheat boiler feed water $6,788 $10,000 - $6,788
-
MMBtu
09 2.2163: Use minimum steam operating pressure $5,708 - - $5,708
-
MMBtu
TOTAL RECOMMENDED $218,509 $89,345 $10,553
264,361
kWh
$207,956
-
MMBtu
TOTAL IMPLEMENTED $206,013 $79,345 $10,553
264,361
kWh
$195,460
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs