ITAC Assessment: KU0084
ITAC logo
ITAC Assessment: KU0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PRINTED ENVELOPES
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 130,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,789 361,372
kWh
Natural Gas $4,302 1,021
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,386 $127 $1,386
26,671
kWh
-
02 2.7261: Install timers and/or thermostats $3,551 $1,400 $2,195
42,204
kWh
$1,356
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $877 $155 $44
879
kWh
$833
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $167 $160 - $167
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $135 - - $135
-
MMBtu
06 2.1123: Install automatic stack damper $84 $144 - $84
-
MMBtu
TOTAL RECOMMENDED $6,200 $1,986 $3,625
69,754
kWh
$2,575
-
MMBtu
TOTAL IMPLEMENTED $1,044 $315 $44
879
kWh
$1,000
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs