Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Cartons
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 222,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 6,864
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,340 6,398,593
kWh
Natural Gas $193,753 65,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $34,745 $2,000 - $34,745
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,272 $40 $2,272
48,359
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,595 $40 $1,595
33,998
kWh
-
04 2.3212: Optimize plant power factor $24,600 $16,488 $24,600
-
kWh
-
TOTAL RECOMMENDED $63,212 $18,568 $28,467
82,357
kWh
$34,745
-
MMBtu
TOTAL IMPLEMENTED $36,340 $2,040 $1,595
33,998
kWh
$34,745
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs