Assessment Year | 1983 |
---|---|
Principal Product | SHEET METAL PIPE |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 34 |
Plant Area |
n/a
|
Annual Production | 12,000
ton
|
Production Hrs. Annual | 2,116
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,677 | 1,130,715 |
kWh
|
$0.061 |
Natural Gas | $44,971 | 11,131 |
MMBtu
|
$4.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,583 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,609 | $6,500 |
$18,081
297,773
kWh
|
$(-5,472.0)
-
MMBtu
|
|
02 | 2.2514: Cover open tanks | $5,578 | - | - |
$5,578
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $3,583 | $200 | - |
$3,583
-
MMBtu
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,287 | $3,500 | - |
$2,287
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,339 | $180 |
$1,339
21,981
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,388 | $1,000 |
$1,388
22,860
kWh
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,095 | $500 | - |
$1,095
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $286 | $250 | - |
$286
-
MMBtu
|
|
TOTAL RECOMMENDED | $28,165 | $12,130 |
$20,808
342,614
kWh
|
$7,357
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,583 | $200 | - |
$3,583
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs