ITAC Assessment: KU0083
ITAC logo
ITAC Assessment: KU0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SHEET METAL PIPE
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 34
Plant Area
n/a
Annual Production 12,000
ton
Production Hrs. Annual 2,116
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,677 1,130,715
kWh
Natural Gas $44,971 11,131
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,609 $6,500 $18,081
297,773
kWh
$(-5,472.0)
-
MMBtu
02 2.2514: Cover open tanks $5,578 - - $5,578
-
MMBtu
03 2.7261: Install timers and/or thermostats $3,583 $200 - $3,583
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,287 $3,500 - $2,287
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,339 $180 $1,339
21,981
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,388 $1,000 $1,388
22,860
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,095 $500 - $1,095
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $286 $250 - $286
-
MMBtu
TOTAL RECOMMENDED $28,165 $12,130 $20,808
342,614
kWh
$7,357
-
MMBtu
TOTAL IMPLEMENTED $3,583 $200 - $3,583
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs