| Assessment Year | 1983 |
|---|---|
| Principal Product | COUNTERTOPS,CABINETS |
| NAICS |
n/a
|
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $1 M to 5M |
| # of Employees | 56 |
| Plant Area |
n/a
|
| Annual Production | 1,500
pieces
|
| Production Hrs. Annual | 2,650
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $24,230 | 325,909 |
kWh
|
$0.074 |
| Natural Gas | $10,854 | 2,910 |
MMBtu
|
$3.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,113 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,507 | $2,164 |
$2,507
33,705
kWh
|
- | |
| 02 | 2.7444: Close holes and openings in building such as broken windows | $6,501 | $1,660 | - |
$6,501
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $3,142 | $100 | - |
$3,142
-
MMBtu
|
|
| 04 | 2.3134: Shift from daytime to nighttime operation | $1,843 | - |
$1,324
17,878
kWh
|
$519
-
MMBtu
|
|
| 05 | 2.7444: Close holes and openings in building such as broken windows | $2,160 | $837 |
$1,608
14,068
kWh
|
$552
-
MMBtu
|
|
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $269 | $200 | - |
$269
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $537 | $200 | - |
$537
-
MMBtu
|
|
| 08 | 2.1123: Install automatic stack damper | $617 | $700 | - |
$617
-
MMBtu
|
|
| 09 | 2.1123: Install automatic stack damper | $537 | $528 | - |
$537
-
MMBtu
|
|
| TOTAL RECOMMENDED | $18,113 | $6,389 |
$5,439
65,651
kWh
|
$12,674
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs