Assessment Year | 2007 |
---|---|
Principal Product | Asphalt Shingle |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
410,000
ft2
|
Annual Production | 122,275
ton
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,994 | 3,427,840 |
kWh
|
$0.068 |
Electricity Demand | $95,942 | 7,854 |
kW-mo/yr
|
$12.22 |
Electricity Fees | $9,300 | - |
|
- |
Natural Gas | $358,042 | 38,902 |
MMBtu
|
$9.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $267,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,816 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $221,890 | $474,000 |
$226,619
3,318,000
kWh
|
$57,923
-
kW-mo/yr
|
$(-62,652.0)
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $25,093 | $7,520 | - | - |
$25,093
-
MMBtu
|
|
03 | 2.4133: Use most efficient type of electric motors | $13,958 | $16,600 |
$10,805
158,193
kWh
|
$3,153
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,724 | $7,500 |
$3,724
47,937
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,816 | $2,235 |
$2,816
41,237
kWh
|
- | - | |
TOTAL RECOMMENDED | $267,481 | $507,855 |
$243,964
3,565,367
kWh
|
$61,076
-
kW-mo/yr
|
$(-37,559.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,816 | $2,235 |
$2,816
41,237
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs