ITAC Assessment: SD0400
ITAC logo
ITAC Assessment: SD0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Asphalt Shingle
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 410,000
ft2
Annual Production 122,275
ton
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,994 3,427,840
kWh
Electricity Demand $95,942 7,854
kW-mo/yr
Electricity Fees $9,300 -
Natural Gas $358,042 38,902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $267,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $221,890 $474,000 $226,619
3,318,000
kWh
$57,923
-
kW-mo/yr
$(-62,652.0)
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $25,093 $7,520 - - $25,093
-
MMBtu
03 2.4133: Use most efficient type of electric motors $13,958 $16,600 $10,805
158,193
kWh
$3,153
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,724 $7,500 $3,724
47,937
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,816 $2,235 $2,816
41,237
kWh
- -
TOTAL RECOMMENDED $267,481 $507,855 $243,964
3,565,367
kWh
$61,076
-
kW-mo/yr
$(-37,559.0)
-
MMBtu
TOTAL IMPLEMENTED $2,816 $2,235 $2,816
41,237
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs