Assessment Year | 1983 |
---|---|
Principal Product | PRINTED GIFT WRAP |
NAICS |
n/a
|
SIC | 2754: Commercial Printing, Gravure |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $309,806 | 8,448,124 |
kWh
|
$0.037 |
Natural Gas | $279,263 | 92,388 |
MMBtu
|
$3.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,639 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $68,280 | $2,361 |
$20,780
567,116
kWh
|
$47,500
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,139 | $1,900 | - |
$9,139
-
MMBtu
|
|
03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $8,631 | $5,200 | - |
$8,631
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,046 | $3,942 |
$4,046
110,492
kWh
|
- | |
05 | 2.7226: Use computer programs to optimize hvac performance | $1,975 | $13,000 |
$1,975
53,927
kWh
|
- | |
06 | 2.3212: Optimize plant power factor | $3,510 | $5,820 |
$3,510
-
kWh
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $664 | $42 | - |
$664
-
MMBtu
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $615 | - |
$615
16,706
kWh
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $502 | $72 |
$502
13,775
kWh
|
- | |
TOTAL RECOMMENDED | $97,362 | $32,337 |
$31,428
762,016
kWh
|
$65,934
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,639 | $13,042 |
$1,975
53,927
kWh
|
$664
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs