ITAC Assessment: KU0065
ITAC logo
ITAC Assessment: KU0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PASTA MAKERS
NAICS
n/a
SIC 2098: Macaroni, Spaghetti, Vermicelli, and Noodles
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,659 5,272,567
kWh
Natural Gas $79,171 28,344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,491 $47,000 $4,491
83,236
kWh
-
02 2.2136: Install / repair insulation on steam lines $12,228 $1,619 - $12,228
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,815 - - $3,815
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $441 - - $441
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $459 $1,000 - $459
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $290 - $290
5,275
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $214 $59 $214
4,103
kWh
-
08 2.1123: Install automatic stack damper $326 $528 - $326
-
MMBtu
TOTAL RECOMMENDED $22,264 $50,206 $4,995
92,614
kWh
$17,269
-
MMBtu
TOTAL IMPLEMENTED $3,815 - - $3,815
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs