ITAC Assessment: KU0063
ITAC logo
ITAC Assessment: KU0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area
n/a
Annual Production 500,000
thousand feet
Production Hrs. Annual 6,072
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,901 2,530,481
kWh
Natural Gas $98,693 32,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,441 $5,865 $7,441
120,750
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,532 $230,000 - $4,532
-
MMBtu
03 2.3212: Optimize plant power factor $2,215 $4,000 $2,215
-
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $670 - $670
10,844
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $173 $82 $173
2,931
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,276 $450 - $1,276
-
MMBtu
07 2.2124: Install de-aerator in place of condensate tank $17,053 $57,400 - $17,053
-
MMBtu
TOTAL RECOMMENDED $33,360 $297,797 $10,499
134,525
kWh
$22,861
-
MMBtu
TOTAL IMPLEMENTED $4,705 $230,082 $173
2,931
kWh
$4,532
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs