Assessment Year | 1982 |
---|---|
Principal Product | CORRUGATED BOXES |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 109 |
Plant Area |
n/a
|
Annual Production | 500,000
thousand feet
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $155,901 | 2,530,481 |
kWh
|
$0.062 |
Natural Gas | $98,693 | 32,521 |
MMBtu
|
$3.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,705 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,441 | $5,865 |
$7,441
120,750
kWh
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,532 | $230,000 | - |
$4,532
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $2,215 | $4,000 |
$2,215
-
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $670 | - |
$670
10,844
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $173 | $82 |
$173
2,931
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,276 | $450 | - |
$1,276
-
MMBtu
|
|
07 | 2.2124: Install de-aerator in place of condensate tank | $17,053 | $57,400 | - |
$17,053
-
MMBtu
|
|
TOTAL RECOMMENDED | $33,360 | $297,797 |
$10,499
134,525
kWh
|
$22,861
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,705 | $230,082 |
$173
2,931
kWh
|
$4,532
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs