ITAC Assessment: IA0017
ITAC logo
ITAC Assessment: IA0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRESSURIZED TANKS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area
n/a
Annual Production 17,570
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,217 1,784,877
kWh
Natural Gas $35,331 7,509
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $9,858 $700 - $9,858
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,694 $2,000 $9,694
155,334
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,603 $500 $3,603
57,737
kWh
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $2,470 - $2,470
39,566
kWh
- -
05 2.6232: Install set-back timers $402 $400 $402
6,448
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $184 $29 $213
3,517
kWh
- $(-29.0)
07 2.7447: Install vinyl strip / high speed / air curtain doors $6,834 $22,000 $(-1,701.0)
(-27,257)
kWh
$8,535
-
MMBtu
-
08 2.7314: Reduce ventilation air $3,955 $3,150 - $3,955
-
MMBtu
-
TOTAL RECOMMENDED $37,000 $28,779 $14,681
235,345
kWh
$22,348
-
MMBtu
$(-29.0)
TOTAL IMPLEMENTED $20,295 $23,200 $1,902
30,480
kWh
$18,393
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs