Assessment Year | 1992 |
---|---|
Principal Product | PRESSURIZED TANKS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 68 |
Plant Area |
n/a
|
Annual Production | 17,570
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,217 | 1,784,877 |
kWh
|
$0.060 |
Natural Gas | $35,331 | 7,509 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,295 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $9,858 | $700 | - |
$9,858
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,694 | $2,000 |
$9,694
155,334
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,603 | $500 |
$3,603
57,737
kWh
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,470 | - |
$2,470
39,566
kWh
|
- | - | |
05 | 2.6232: Install set-back timers | $402 | $400 |
$402
6,448
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $184 | $29 |
$213
3,517
kWh
|
- | $(-29.0) | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,834 | $22,000 |
$(-1,701.0)
(-27,257)
kWh
|
$8,535
-
MMBtu
|
- | |
08 | 2.7314: Reduce ventilation air | $3,955 | $3,150 | - |
$3,955
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $37,000 | $28,779 |
$14,681
235,345
kWh
|
$22,348
-
MMBtu
|
$(-29.0) | ||
TOTAL IMPLEMENTED | $20,295 | $23,200 |
$1,902
30,480
kWh
|
$18,393
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs