| Assessment Year | 1992 |
|---|---|
| Principal Product | PRESSURIZED TANKS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 68 |
| Plant Area |
n/a
|
| Annual Production | 17,570
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,217 | 1,784,877 |
kWh
|
$0.060 |
| Natural Gas | $35,331 | 7,509 |
MMBtu
|
$4.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,295 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $9,858 | $700 | - |
$9,858
-
MMBtu
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,694 | $2,000 |
$9,694
155,334
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,603 | $500 |
$3,603
57,737
kWh
|
- | - | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,470 | - |
$2,470
39,566
kWh
|
- | - | |
| 05 | 2.6232: Install set-back timers | $402 | $400 |
$402
6,448
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $184 | $29 |
$213
3,517
kWh
|
- | $(-29.0) | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,834 | $22,000 |
$(-1,701.0)
(-27,257)
kWh
|
$8,535
-
MMBtu
|
- | |
| 08 | 2.7314: Reduce ventilation air | $3,955 | $3,150 | - |
$3,955
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $37,000 | $28,779 |
$14,681
235,345
kWh
|
$22,348
-
MMBtu
|
$(-29.0) | ||
| TOTAL IMPLEMENTED | $20,295 | $23,200 |
$1,902
30,480
kWh
|
$18,393
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs