Assessment Year | 2000 |
---|---|
Principal Product | Steel doors and frames |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
38,000
ft2
|
Annual Production | 10,500
pieces
|
Production Hrs. Annual | 2,800
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Demand | $5,441 | 1,112 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $3,660 | - |
|
- |
Natural Gas | $5,381 | 850 |
MMBtu
|
$6.33 |
LPG | $9,631 | 697 |
MMBtu
|
$13.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,235 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $1,075 | $2,610 | - |
$1,075
-
MMBtu
|
- | - | - | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $980 | $1,075 |
$40
879
kWh
|
- | - | - | $940 | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $715 | $1,820 | - |
$715
-
MMBtu
|
- | - | - | |
04 | 3.1191: Change procedures / equipment / operating conditions | $710 | - | - | - |
$710
-
lb
|
- | - | |
05 | 3.7131: Use a rag recycle service | $240 | - | - | - |
$1,200
-
lb
|
$(-960.0) | - | |
06 | 3.5316: Contract a wood pallet recycling company | $160 | - | - | - |
$160
-
lb
|
- | - | |
TOTAL RECOMMENDED | $3,880 | $5,505 |
$40
879
kWh
|
$1,790
-
MMBtu
|
$2,070
-
lb
|
$(-960.0) | $940 | ||
TOTAL IMPLEMENTED | $1,235 | $2,610 | - |
$1,075
-
MMBtu
|
$160
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs