ITAC Assessment: KU0058
ITAC logo
ITAC Assessment: KU0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MILK & ICE CREAM PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,841 4,348,183
kWh
Natural Gas $47,270 14,310
MMBtu
Fuel Oil #2 $96,600 11,760
MMBtu
Other Energy $187,000 21,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,433 $1,567 $3,433
59,789
kWh
- - -
02 2.2437: Recover waste heat from equipment $14,678 $24,000 - $14,678
-
MMBtu
- -
03 2.1335: Replace gasoline with diesel, lpg, or natural gas $10,505 $27,500 - - $(-14,520.0)
-
MMBtu
$25,025
-
MMBtu
04 2.8226: Increase efficiency of trucks $4,237 - - - - $4,237
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $962 $220 $338
5,862
kWh
$624
-
MMBtu
- -
06 2.7442: Keep doors and windows shut when not on use $8,789 $1,493 $4,340
75,615
kWh
$4,449
-
MMBtu
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,260 $600 - $3,260
-
MMBtu
- -
TOTAL RECOMMENDED $45,864 $55,380 $8,111
141,266
kWh
$23,011
-
MMBtu
$(-14,520.0)
-
MMBtu
$29,262
-
MMBtu
TOTAL IMPLEMENTED $17,938 $24,600 - $17,938
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs