ITAC Assessment: KU0052
ITAC logo
ITAC Assessment: KU0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product IND. BREAKS,SHEARS
NAICS
n/a
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 150
pieces
Production Hrs. Annual 2,116
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,826 274,033
kWh
Natural Gas $14,686 4,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $491 $1,329 $491
8,499
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,003 $2,263 - $4,003
-
MMBtu
03 2.4321: Upgrade obsolete equipment $6,450 $2,135 $6,450
111,665
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $391 $360 $391
6,741
kWh
-
05 2.6218: Turn off equipment when not in use $150 - - $150
-
MMBtu
TOTAL RECOMMENDED $11,485 $6,087 $7,332
126,905
kWh
$4,153
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs