ITAC Assessment: KU0045
ITAC logo
ITAC Assessment: KU0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ORNAMENTS AND LABELS
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 303,500
pieces
Production Hrs. Annual 3,535
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,907 644,490
kWh
Natural Gas $5,383 1,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $4,404 $6,640 - $4,404
-
MMBtu
02 2.3191: Use demand controller or load shedder $2,417 $2,850 $2,417
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,461 - $1,461
20,516
kWh
-
04 2.7224: Reduce space conditioning during non-working hours $1,638 - - $1,638
-
MMBtu
05 2.7444: Close holes and openings in building such as broken windows $659 $200 - $659
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $461 $100 $461
6,448
kWh
-
07 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $547 - - $547
-
MMBtu
08 2.6212: Turn off equipment during breaks, reduce operating time $417 - $417
5,862
kWh
-
TOTAL RECOMMENDED $12,004 $9,790 $4,756
32,826
kWh
$7,248
-
MMBtu
TOTAL IMPLEMENTED $4,722 $200 $1,878
26,378
kWh
$2,844
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs