ITAC Assessment: AT0113
ITAC logo
ITAC Assessment: AT0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product WOODEN FURNITURE
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 78,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,981 587,925
kWh
Natural Gas $23,896 5,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $4,641 $10,000 - $4,641
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,031 $3,096 $2,031
29,015
kWh
-
03 2.4133: Use most efficient type of electric motors $181 $260 $181
2,638
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $419 - $419
5,862
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,565 $200 $1,565
22,567
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $186 $300 $186
2,638
kWh
-
TOTAL RECOMMENDED $9,023 $13,856 $4,382
62,720
kWh
$4,641
-
MMBtu
TOTAL IMPLEMENTED $9,023 $13,856 $4,382
62,720
kWh
$4,641
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs