| Assessment Year | 2025 |
|---|---|
| Principal Product | Wiring Harness |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
126,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 5,564
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $199,684 | 2,881,753 |
kWh
|
$0.069 | |
| Electricity Demand | $83,692 | 7,643 |
kW-mo/yr
|
$10.95 | |
| Electricity Fees | $73,656 | - |
|
- | |
| Natural Gas | $5,877 | 489 |
MMBtu
|
$12.02 | |
| Waste Disposal Costs | |||||
| Water Usage | $33,922 | 1,041 |
Tgal
|
$32.60 | |
| TOTAL YEARLY COSTS | $396,831 | ||||
| RECOMMENDED SAVINGS* | $705,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,372 | $5,609 |
$6,244
90,100
kWh
|
$2,128
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,191 | - |
$4,617
66,626
kWh
|
$1,573
-
kW-mo/yr
|
- | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $110,740 | $106,736 |
$5,014
72,358
kWh
|
- | $9,006 | $96,720 | |
| 04 | 4.132: Purchase new equipment to reduce material use / cost | $180,689 | $135,000 |
$6,748
97,370
kWh
|
$4,599
-
kW-mo/yr
|
$19,810 | $149,533 | |
| 05 | 2.7141: Lower light fixtures in high ceiling areas | $400,000 | $112,035 | - | - | $400,000 | - | |
| TOTAL RECOMMENDED | $705,992 | $359,380 |
$22,623
326,453
kWh
|
$8,300
-
kW-mo/yr
|
$428,816 | $246,253 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs