ITAC Assessment: NT0052
ITAC logo
ITAC Assessment: NT0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wiring Harness
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 126,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 5,564
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,684 2,881,753
kWh
Electricity Demand $83,692 7,643
kW-mo/yr
Electricity Fees $73,656 -
Natural Gas $5,877 489
MMBtu
Waste Disposal Costs
Water Usage $33,922 1,041
Tgal
TOTAL YEARLY COSTS $396,831
RECOMMENDED SAVINGS* $705,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,372 $5,609 $6,244
90,100
kWh
$2,128
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,191 - $4,617
66,626
kWh
$1,573
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $110,740 $106,736 $5,014
72,358
kWh
- $9,006 $96,720
04 4.132: Purchase new equipment to reduce material use / cost $180,689 $135,000 $6,748
97,370
kWh
$4,599
-
kW-mo/yr
$19,810 $149,533
05 2.7141: Lower light fixtures in high ceiling areas $400,000 $112,035 - - $400,000 -
TOTAL RECOMMENDED $705,992 $359,380 $22,623
326,453
kWh
$8,300
-
kW-mo/yr
$428,816 $246,253
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs