ITAC Assessment: KU0042
ITAC logo
ITAC Assessment: KU0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BANK DEPOSIT TICKETS
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 540
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,072
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,688 8,244,432
kWh
Natural Gas $63,345 21,305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,306 $1,000 $29,306
539,859
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $8,980 - $8,980
165,299
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $2,367 - - $2,367
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $622 $350 - $622
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $398 $140 $398
7,327
kWh
-
TOTAL RECOMMENDED $41,673 $1,490 $38,684
712,485
kWh
$2,989
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs