Assessment Year | 2000 |
---|---|
Principal Product | custom architectural woodwork |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
110,077
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 3,146
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,718 | 2,459,555 |
kWh
|
$0.028 |
Electricity Demand | $75,353 | 18,142 |
kW-mo/yr
|
$4.15 |
Electricity Fees | $4,380 | - |
|
- |
Natural Gas | $23,363 | 5,494 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,870 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,560 | $16,820 | - |
$6,560
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $2,610 | $4,900 |
$1,530
38,687
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,410 | - |
$490
12,309
kWh
|
$380
-
kW-mo/yr
|
- | - | - | - | $(-320.0) | $860 | |
04 | 2.2437: Recover waste heat from equipment | $1,340 | $1,390 | - | - |
$1,340
-
MMBtu
|
- | - | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $830 | $470 |
$730
18,464
kWh
|
$490
-
kW-mo/yr
|
- | - | - | - | $(-390.0) | - | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $9,460 | $2,000 | - | - | - |
$760
-
gal
|
$450
-
lb
|
- | - | $8,250 | |
07 | 3.6192: Use a less expensive method of waste removal | $660 | - | - | - | - | - | - |
$670
-
lb
|
- | $(-10.0) | |
TOTAL RECOMMENDED | $22,870 | $25,580 |
$2,750
69,460
kWh
|
$8,510
-
kW-mo/yr
|
$1,340
-
MMBtu
|
$760
-
gal
|
$450
-
lb
|
$670
-
lb
|
$(-710.0) | $9,100 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||