ITAC Assessment: CO0462
ITAC logo
ITAC Assessment: CO0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product custom architectural woodwork
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 110,077
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 3,146
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,718 2,459,555
kWh
Electricity Demand $75,353 18,142
kW-mo/yr
Electricity Fees $4,380 -
Natural Gas $23,363 5,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $6,560 $16,820 - $6,560
-
kW-mo/yr
- - - - - -
02 2.4239: Eliminate or reduce compressed air usage $2,610 $4,900 $1,530
38,687
kWh
$1,080
-
kW-mo/yr
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,410 - $490
12,309
kWh
$380
-
kW-mo/yr
- - - - $(-320.0) $860
04 2.2437: Recover waste heat from equipment $1,340 $1,390 - - $1,340
-
MMBtu
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $830 $470 $730
18,464
kWh
$490
-
kW-mo/yr
- - - - $(-390.0) -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $9,460 $2,000 - - - $760
-
gal
$450
-
lb
- - $8,250
07 3.6192: Use a less expensive method of waste removal $660 - - - - - - $670
-
lb
- $(-10.0)
TOTAL RECOMMENDED $22,870 $25,580 $2,750
69,460
kWh
$8,510
-
kW-mo/yr
$1,340
-
MMBtu
$760
-
gal
$450
-
lb
$670
-
lb
$(-710.0) $9,100
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs