ITAC Assessment: IC0210
ITAC logo
ITAC Assessment: IC0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Food Packaging Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 71,920
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,530 5,816,998
kWh
Electricity Demand $111,103 26,390
kW-mo/yr
Natural Gas $12,491 2,070
MMBtu
TOTAL YEARLY COSTS $647,124
RECOMMENDED SAVINGS* $191,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $156,049 $91,000 $189,783
2,108,700
kWh
$12,504
-
kW-mo/yr
$(-46,238.0)
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $15,726 $8,414 $15,726
174,730
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $8,962 $2,550 $8,424
93,589
kWh
$538
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,892 $3,797 $10,061
111,763
kWh
$831
-
kW-mo/yr
-
TOTAL RECOMMENDED $191,628 $105,761 $223,994
2,488,782
kWh
$13,872
-
kW-mo/yr
$(-46,238.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs