ITAC Assessment: KU0039
ITAC logo
ITAC Assessment: KU0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BOTTLED CARBONATED BEVERAGES
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 5,400,000
pieces
Production Hrs. Annual 2,016
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,592 2,840,856
kWh
Natural Gas $61,477 21,117
MMBtu
Other Energy $300,266 35,979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,817 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.1335: Replace gasoline with diesel, lpg, or natural gas $26,510 $35,000 - - $26,510
-
MMBtu
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $18,206 $7,700 $18,206
303,341
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $7,081 $2,129 - $7,081
-
MMBtu
-
04 2.3191: Use demand controller or load shedder $2,511 $3,000 $2,511
-
kWh
- -
05 2.8226: Increase efficiency of trucks $9,000 - - - $9,000
-
MMBtu
06 2.2437: Recover waste heat from equipment $7,569 $25,000 - $7,569
-
MMBtu
-
07 2.7261: Install timers and/or thermostats $6,940 $100 $1,754
29,308
kWh
$5,186
-
MMBtu
-
TOTAL RECOMMENDED $77,817 $72,929 $22,471
332,649
kWh
$19,836
-
MMBtu
$35,510
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs