| Assessment Year | 1982 |
|---|---|
| Principal Product | BOTTLED CARBONATED BEVERAGES |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 5,400,000
pieces
|
| Production Hrs. Annual | 2,016
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $170,592 | 2,840,856 |
kWh
|
$0.060 |
| Natural Gas | $61,477 | 21,117 |
MMBtu
|
$2.91 |
| Other Energy | $300,266 | 35,979 |
MMBtu
|
$8.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $77,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1335: Replace gasoline with diesel, lpg, or natural gas | $26,510 | $35,000 | - | - |
$26,510
-
MMBtu
|
|
| 02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $18,206 | $7,700 |
$18,206
303,341
kWh
|
- | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,081 | $2,129 | - |
$7,081
-
MMBtu
|
- | |
| 04 | 2.3191: Use demand controller or load shedder | $2,511 | $3,000 |
$2,511
-
kWh
|
- | - | |
| 05 | 2.8226: Increase efficiency of trucks | $9,000 | - | - | - |
$9,000
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $7,569 | $25,000 | - |
$7,569
-
MMBtu
|
- | |
| 07 | 2.7261: Install timers and/or thermostats | $6,940 | $100 |
$1,754
29,308
kWh
|
$5,186
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $77,817 | $72,929 |
$22,471
332,649
kWh
|
$19,836
-
MMBtu
|
$35,510
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs