| Assessment Year | 1981 |
|---|---|
| Principal Product | SHEET METAL PRODUCTS |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 86 |
| Plant Area |
n/a
|
| Annual Production | 1,500,000
lb
|
| Production Hrs. Annual | 6,072
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,698 | 803,341 |
kWh
|
$0.043 |
| Natural Gas | $12,159 | 4,492 |
MMBtu
|
$2.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,575 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,729 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $2,125 | $55 |
$2,125
49,238
kWh
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $310 | - |
$164
3,810
kWh
|
$146
-
MMBtu
|
|
| 03 | 2.7244: Revise smoke cleanup from operations | $2,846 | $3,200 |
$2,846
65,944
kWh
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,911 | - |
$974
22,567
kWh
|
$937
-
MMBtu
|
|
| 05 | 2.3212: Optimize plant power factor | $310 | $500 |
$310
-
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $4,568 | $2,688 |
$4,568
105,803
kWh
|
- | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,505 | $6,302 | - |
$3,505
-
MMBtu
|
|
| TOTAL RECOMMENDED | $15,575 | $12,745 |
$10,987
247,362
kWh
|
$4,588
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,729 | $9,545 |
$8,141
181,418
kWh
|
$4,588
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs