| Assessment Year | 1981 |
|---|---|
| Principal Product | ALUMINUM TRUCK BODIES |
| NAICS |
n/a
|
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 1,200
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $10,594 | 177,902 |
kWh
|
$0.060 |
| Natural Gas | $13,649 | 4,529 |
MMBtu
|
$3.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,858 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $169 | $100 |
$169
2,931
kWh
|
- | |
| 02 | 2.2711: Utilize outside air instead of conditioned air for drying | $1,267 | $1,200 | - |
$1,267
-
MMBtu
|
|
| 03 | 2.7224: Reduce space conditioning during non-working hours | $992 | - |
$199
3,224
kWh
|
$793
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $685 | $2,076 |
$685
11,430
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,689 | $3,748 | - |
$1,689
-
MMBtu
|
|
| TOTAL RECOMMENDED | $4,802 | $7,124 |
$1,053
17,585
kWh
|
$3,749
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,858 | $3,848 |
$169
2,931
kWh
|
$1,689
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs