ITAC Assessment: KU0025
ITAC logo
ITAC Assessment: KU0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1981
Principal Product ALUMINUM TRUCK BODIES
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 1,200
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,594 177,902
kWh
Natural Gas $13,649 4,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $169 $100 $169
2,931
kWh
-
02 2.2711: Utilize outside air instead of conditioned air for drying $1,267 $1,200 - $1,267
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $992 - $199
3,224
kWh
$793
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $685 $2,076 $685
11,430
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,689 $3,748 - $1,689
-
MMBtu
TOTAL RECOMMENDED $4,802 $7,124 $1,053
17,585
kWh
$3,749
-
MMBtu
TOTAL IMPLEMENTED $1,858 $3,848 $169
2,931
kWh
$1,689
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs