Assessment Year | 1981 |
---|---|
Principal Product | ALUMINUM TRUCK BODIES |
NAICS |
n/a
|
SIC | 3713: Truck and Bus Bodies |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $10,594 | 177,902 |
kWh
|
$0.060 |
Natural Gas | $13,649 | 4,529 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,858 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $169 | $100 |
$169
2,931
kWh
|
- | |
02 | 2.2711: Utilize outside air instead of conditioned air for drying | $1,267 | $1,200 | - |
$1,267
-
MMBtu
|
|
03 | 2.7224: Reduce space conditioning during non-working hours | $992 | - |
$199
3,224
kWh
|
$793
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $685 | $2,076 |
$685
11,430
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,689 | $3,748 | - |
$1,689
-
MMBtu
|
|
TOTAL RECOMMENDED | $4,802 | $7,124 |
$1,053
17,585
kWh
|
$3,749
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,858 | $3,848 |
$169
2,931
kWh
|
$1,689
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs