ITAC Assessment: KG0091
ITAC logo
ITAC Assessment: KG0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plain and printed envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $5
M
to 10
M
# of Employees 62
Plant Area 75,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,490 3,558,031
kWh
Electricity Demand $52,016 7,780
kW-mo/yr
Electricity Fees $1,560 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,630 $1,480 n/a $1,846
58,617
kWh
$784
-
kW-mo/yr
- - -
02 2.2531: Re-size charging openings or add movable cover or door $1,361 $107 n/a $1,361
43,083
kWh
- - - -
03 2.7135: Install occupancy sensors $1,292 $310 n/a $1,292
41,032
kWh
- - - -
04 2.7261: Install timers and/or thermostats $912 $150 n/a $912
29,015
kWh
- - - -
05 2.7261: Install timers and/or thermostats $467 $150 n/a $467
14,947
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $401 $300 n/a $401
12,896
kWh
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $7,560 $2,700 n/a - - - $7,560
-
lb
-
08 3.4151: Minimize water usage $4,050 $456 n/a - - $4,050
-
Tgal
- -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $259 - n/a - - - $259
-
lb
-
10 4.423: Move product using mechanical means $8,100 $150 n/a - - - - $8,100
11 4.123: Reduce defects by reducing product tipping $1,350 $70 n/a - - - - $1,350
TOTAL RECOMMENDED $28,382 $5,873 $6,279
199,590
kWh
$784
-
kW-mo/yr
$4,050
-
Tgal
$7,819
-
lb
$9,450
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs