ITAC Assessment: KG0082
ITAC logo
ITAC Assessment: KG0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Jean pants and shorts
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $100
M
to 500
M
# of Employees 630
Plant Area 131,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 2,083
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,681 6,399,766
kWh
Electricity Demand $119,939 18,280
kW-mo/yr
Electricity Fees $1,560 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7251: Reduce air conditioning load by evaporating water from roof $9,336 $250 n/a $9,336
295,428
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,010 $14,000 n/a $4,010
114,596
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,669 $604 n/a $1,037
32,825
kWh
$632
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,210 $2,650 n/a $753
23,740
kWh
$457
-
kW-mo/yr
- -
05 2.7261: Install timers and/or thermostats $823 $600 n/a $823
26,084
kWh
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $15,960 - n/a - - $15,960
-
lb
-
07 3.5212: Regrind, reuse, or sell scrap plastic parts $5,525 - n/a - - $5,525
-
lb
-
08 3.5212: Regrind, reuse, or sell scrap plastic parts $2,174 $1,079 n/a - - $2,174
-
lb
-
09 4.321: Optimize production lot sizes and inventories $38,025 - n/a - - - $38,025
TOTAL RECOMMENDED $78,732 $19,183 $15,959
492,673
kWh
$1,089
-
kW-mo/yr
$23,659
-
lb
$38,025
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs