ITAC Assessment: NV0167
ITAC logo
ITAC Assessment: NV0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product instruments to measure electricity
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 20,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,742 346,000
kWh
Electricity Demand $3,920 904
kW-mo/yr
Electricity Fees $724 -
Natural Gas $2,085 259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,053

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,639 $200 $2,379
29,308
kWh
$254
-
kW-mo/yr
$6 - -
02 2.4221: Install compressor air intakes in coolest locations $414 $50 $373
4,689
kWh
$40
-
kW-mo/yr
$1 - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $229 - - - - $229
-
lb
-
04 4.513: Re-arrange equipment layout to reduce labor costs $3,315 $680 - - - - $3,315
TOTAL RECOMMENDED $6,597 $930 $2,752
33,997
kWh
$294
-
kW-mo/yr
$7 $229
-
lb
$3,315
TOTAL IMPLEMENTED $3,053 $250 $2,752
33,997
kWh
$294
-
kW-mo/yr
$7 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs