| Assessment Year | 2000 |
|---|---|
| Principal Product | instruments to measure electricity |
| NAICS |
n/a
|
| SIC | 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals |
| Sales Range | $5 M to 10M |
| # of Employees | 65 |
| Plant Area |
20,000
ft2
|
| Annual Production | 150,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,742 | 346,000 |
kWh
|
$0.086 |
| Electricity Demand | $3,920 | 904 |
kW-mo/yr
|
$4.34 |
| Electricity Fees | $724 | - |
|
- |
| Natural Gas | $2,085 | 259 |
MMBtu
|
$8.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,597 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,053 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,639 | $200 |
$2,379
29,308
kWh
|
$254
-
kW-mo/yr
|
$6 | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $414 | $50 |
$373
4,689
kWh
|
$40
-
kW-mo/yr
|
$1 | - | - | |
| 03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $229 | - | - | - | - |
$229
-
lb
|
- | |
| 04 | 4.513: Re-arrange equipment layout to reduce labor costs | $3,315 | $680 | - | - | - | - | $3,315 | |
| TOTAL RECOMMENDED | $6,597 | $930 |
$2,752
33,997
kWh
|
$294
-
kW-mo/yr
|
$7 |
$229
-
lb
|
$3,315 | ||
| TOTAL IMPLEMENTED | $3,053 | $250 |
$2,752
33,997
kWh
|
$294
-
kW-mo/yr
|
$7 | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs