ITAC Assessment: UU0055
ITAC logo
ITAC Assessment: UU0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product ELECTRONIC HARDWARE
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 100,000
ft2
Annual Production 231,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,962 2,204,720
kWh
Electricity Demand $18,482 6,770
kW-mo/yr
Electricity Fees $4,427 -
Natural Gas $25,601 45,187
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $710 $710 $587
18,000
kWh
$123
-
kW-mo/yr
-
02 2.7131: Add area lighting switches $659 $500 $544
16,640
kWh
$115
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $430 $1,870 - - $430
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $889 $349 $694
21,216
kWh
$195
-
kW-mo/yr
-
05 2.7234: Use heat pump for space conditioning $2,492 $39,000 $1,844
56,400
kWh
$648
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $9,273 $7,500 $7,236
221,347
kWh
$2,037
-
kW-mo/yr
-
07 2.2314: Replace heat treating oven with more efficient unit $12,956 $21,000 $12,170
372,300
kWh
$1,219
-
kW-mo/yr
$(-433.0)
-
MMBtu
TOTAL RECOMMENDED $27,409 $70,929 $23,075
705,903
kWh
$4,337
-
kW-mo/yr
$(-3.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs