ITAC Assessment: KG0080
ITAC logo
ITAC Assessment: KG0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed phamphlet and fliers
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 37,000
ft2
Annual Production 170,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,011 1,074,443
kWh
Electricity Demand $44,485 3,098
kW-mo/yr
Electricity Fees $681 -
Natural Gas $3,506 1,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7261: Install timers and/or thermostats $6,790 $150 n/a $6,790
237,397
kWh
- - -
02 2.7251: Reduce air conditioning load by evaporating water from roof $5,869 $500 n/a $5,869
205,158
kWh
- - -
03 2.4133: Use most efficient type of electric motors $3,024 $7,350 n/a $1,588
55,393
kWh
$1,436
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,637 $684 n/a $1,114
38,980
kWh
$1,523
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $939 $25 n/a $939
32,825
kWh
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,537 - n/a - - $1,537
-
lb
-
07 3.4151: Minimize water usage $1,296 $371 n/a - - $1,296
-
lb
-
08 4.513: Re-arrange equipment layout to reduce labor costs $36,620 $3,000 n/a - - - $36,620
09 4.513: Re-arrange equipment layout to reduce labor costs $40,917 $7,500 n/a - - - $40,917
TOTAL RECOMMENDED $99,629 $19,580 $16,300
569,753
kWh
$2,959
-
kW-mo/yr
$2,833
-
lb
$77,537
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs