Assessment Year | 1997 |
---|---|
Principal Product | Printed phamphlet and fliers |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
37,000
ft2
|
Annual Production | 170,000,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,011 | 1,074,443 |
kWh
|
$0.029 |
Electricity Demand | $44,485 | 3,098 |
kW-mo/yr
|
$14.36 |
Electricity Fees | $681 | - |
|
- |
Natural Gas | $3,506 | 1,037 |
MMBtu
|
$3.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $6,790 | $150 | n/a |
$6,790
237,397
kWh
|
- | - | - |
02 | 2.7251: Reduce air conditioning load by evaporating water from roof | $5,869 | $500 | n/a |
$5,869
205,158
kWh
|
- | - | - |
03 | 2.4133: Use most efficient type of electric motors | $3,024 | $7,350 | n/a |
$1,588
55,393
kWh
|
$1,436
-
kW-mo/yr
|
- | - |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,637 | $684 | n/a |
$1,114
38,980
kWh
|
$1,523
-
kW-mo/yr
|
- | - |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $939 | $25 | n/a |
$939
32,825
kWh
|
- | - | - |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,537 | - | n/a | - | - |
$1,537
-
lb
|
- |
07 | 3.4151: Minimize water usage | $1,296 | $371 | n/a | - | - |
$1,296
-
lb
|
- |
08 | 4.513: Re-arrange equipment layout to reduce labor costs | $36,620 | $3,000 | n/a | - | - | - | $36,620 |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $40,917 | $7,500 | n/a | - | - | - | $40,917 |
TOTAL RECOMMENDED | $99,629 | $19,580 |
$16,300
569,753
kWh
|
$2,959
-
kW-mo/yr
|
$2,833
-
lb
|
$77,537 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs