ITAC Assessment: WI0238
ITAC logo
ITAC Assessment: WI0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Shopping Carts
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 137,000
ft2
Annual Production 170,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,688 2,648,886
kWh
Natural Gas $98,945 34,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3312: Install efficient rectifiers $68,726 $81,000 $68,726
785,756
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $13,411 $2,500 - $13,411
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $4,134 $1,400 - $4,134
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,493 $6,600 $4,493
51,290
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $384 $880 $384
4,396
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,441 $180 $4,441
48,652
kWh
-
TOTAL RECOMMENDED $95,589 $92,560 $78,044
890,094
kWh
$17,545
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs