Assessment Year | 1995 |
---|---|
Principal Product | Kraft paper honeycomb panels |
NAICS |
n/a
|
SIC | 2649: |
Sales Range | $5 M to 10M |
# of Employees | 51 |
Plant Area |
92,000
ft2
|
Annual Production | 150,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,622 | 1,000,293 |
kWh
|
$0.069 |
Natural Gas | $14,500 | 5,377 |
MMBtu
|
$2.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,028 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,700 | $360 |
$1,700
24,912
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $900 | $600 | - |
$900
-
MMBtu
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $205 | $380 |
$205
3,224
kWh
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,900 | $85,000 |
$18,900
-
kWh
|
- | - | |
05 | 2.7314: Reduce ventilation air | $400 | $500 | - |
$400
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $512 | $260 | - |
$512
-
MMBtu
|
- | |
07 | 2.2113: Repair or replace steam traps | $716 | $600 | - |
$716
-
MMBtu
|
- | |
08 | 3.5316: Contract a wood pallet recycling company | $100 | - | - | - |
$100
-
lb
|
|
09 | 3.1162: Use less wasteful packaging | $585 | $600 | - | - |
$585
-
lb
|
|
TOTAL RECOMMENDED | $24,018 | $88,300 |
$20,805
28,136
kWh
|
$2,528
-
MMBtu
|
$685
-
lb
|
||
TOTAL IMPLEMENTED | $3,028 | $1,220 |
$1,700
24,912
kWh
|
$1,228
-
MMBtu
|
$100
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs