Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Snack Cakes
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range less than $500
k
# of Employees 200
Plant Area 50,000
ft2
Annual Production 2,250,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,261 2,974,560
kWh
Electricity Demand $64,619 6,918
kW-mo/yr
Electricity Fees $6,684 -
Natural Gas $250,000 32,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,500 $12,500 - $3,500 -
02 2.2511: Insulate bare equipment $520 $1,700 - - $520
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,829 $15,912 $2,829
18,398
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,829 $15,912 $2,829
18,398
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,957 $11,633 $9,957
101,853
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $947 $3,646 $947
7,871
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $506 $1,243 $506
7,228
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,508 $1,641 $1,508
18,346
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $702 $263 $702
4,036
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,633 $5,950 $1,633
15,503
kWh
- -
TOTAL RECOMMENDED $24,931 $70,400 $20,911
191,633
kWh
$3,500 $520
-
MMBtu
TOTAL IMPLEMENTED $23,298 $64,450 $19,278
176,130
kWh
$3,500 $520
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs