ITAC Assessment: KG0073
ITAC logo
ITAC Assessment: KG0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 175,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,247 4,108,441
kWh
Electricity Demand $77,984 11,701
kW-mo/yr
Electricity Fees $6,717 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,215 $3,800 $10,454
338,218
kWh
$3,761
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,994 $20,000 $8,950
179,074
kWh
$2,044
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,097 $23,240 $7,064
228,605
kWh
$2,033
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,404 $922 $1,676
54,220
kWh
$728
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,439 $2,190 $1,439
46,600
kWh
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,258 $1,150 $1,258
40,739
kWh
- - -
07 2.7261: Install timers and/or thermostats $1,209 $750 $1,209
41,618
kWh
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $1,072 $4,550 $1,072
97,304
kWh
- - -
09 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $409 $315 $409
13,189
kWh
- - -
10 3.4151: Minimize water usage $33,988 $2,930 - - $33,988
-
Tgal
-
11 3.5313: Increase amount of waste recovered for resale $34,825 $500 - - - $34,825
-
lb
12 3.4154: Eliminate leaks in water lines and valves $821 - - - $821
-
Tgal
-
TOTAL RECOMMENDED $111,731 $60,347 $33,531
1,039,567
kWh
$8,566
-
kW-mo/yr
$34,809
-
Tgal
$34,825
-
lb
TOTAL IMPLEMENTED $63,829 $30,362 $21,661
703,400
kWh
$6,522
-
kW-mo/yr
$821
-
Tgal
$34,825
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs