ITAC Assessment: MA0656
ITAC logo
ITAC Assessment: MA0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Aerospace components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,538 3,282,707
kWh
Electricity Demand $134,920 13,770
kW-mo/yr
Electricity Fees $9,828 -
Fuel Oil #4 $178,067 12,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $181,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,238 $900 $33,238
231,782
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,273 $19,075 $27,685
193,065
kWh
$4,588
-
kW-mo/yr
- -
03 2.2136: Install / repair insulation on steam lines $2,578 $2,400 - - - $2,578
-
MMBtu
04 2.2437: Recover waste heat from equipment $16,891 $15,755 - - - $16,891
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $3,718 $3,915 $3,718
25,925
kWh
- - -
06 2.4226: Use / purchase optimum sized compressor $36,936 $68,200 $36,936
257,573
kWh
- - -
07 2.1331: Burn a less expensive grade of fuel $54,013 $100,000 - - $(-124,045.0)
-
MMBtu
$178,058
-
MMBtu
08 2.7135: Install occupancy sensors $1,714 $3,865 $1,714
11,950
kWh
- - -
TOTAL RECOMMENDED $181,361 $214,110 $103,291
720,295
kWh
$4,588
-
kW-mo/yr
$(-124,045.0)
-
MMBtu
$197,527
-
MMBtu
TOTAL IMPLEMENTED $129,619 $176,880 $75,606
527,230
kWh
- $(-124,045.0)
-
MMBtu
$178,058
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs