ITAC Assessment: KG0069
ITAC logo
ITAC Assessment: KG0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cottage cheese & Sour cream
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 57,350
ft2
Annual Production 1,640,000
lb
Production Hrs. Annual 3,744
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,685 2,922,040
kWh
Electricity Demand $97,344 7,200
kW-mo/yr
Electricity Fees $3,849 -
Natural Gas $31,323 3,974
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $205,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7229: Air condition only space necessary $12,760 $1,150 $12,760
527,257
kWh
- - - -
02 2.2626: Avoid frost formation on evaporators $6,712 $2,000 $4,034
166,764
kWh
$2,678
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $2,320 $325 $2,320
95,838
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $4,979 $13,870 $1,848
76,495
kWh
$3,131
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $2,407 $4,921 $2,407
99,355
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,821 $509 $1,012
43,376
kWh
$809
-
kW-mo/yr
- - -
07 2.2414: Use waste heat from hot flue gases to preheat $855 $2,275 $855
31,946
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $466 $1,060 $466
195,193
kWh
- - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $462 $950 $234
9,672
kWh
$228
-
kW-mo/yr
- - -
10 2.2511: Insulate bare equipment $246 $893 $246
10,258
kWh
- - - -
11 2.7261: Install timers and/or thermostats $240 $150 $240
9,965
kWh
- - - -
12 2.8114: Change rate schedules or other changes in utility service $6,740 - - - $6,740 - -
13 3.5315: Lease / purchase baler; sell cardboard to recycler $1,720 - - - - - $1,720
-
lb
14 3.5131: Recycle white water $12,464 $2,930 - - - $12,464
-
Tgal
-
15 4.322: Eliminate old stock and modify inventory control $177,789 $30,000 - - - - $177,789
-
lb
TOTAL RECOMMENDED $231,981 $61,033 $26,422
1,266,119
kWh
$6,846
-
kW-mo/yr
$6,740 $12,464
-
Tgal
$179,509
-
lb
TOTAL IMPLEMENTED $205,495 $51,068 $3,423
138,336
kWh
$3,359
-
kW-mo/yr
$6,740 $12,464
-
Tgal
$179,509
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs