Assessment Year | 1996 |
---|---|
Principal Product | Cottage cheese & Sour cream |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
57,350
ft2
|
Annual Production | 1,640,000
lb
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,685 | 2,922,040 |
kWh
|
$0.059 |
Electricity Demand | $97,344 | 7,200 |
kW-mo/yr
|
$13.52 |
Electricity Fees | $3,849 | - |
|
- |
Natural Gas | $31,323 | 3,974 |
MMBtu
|
$7.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $231,981 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $205,495 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $12,760 | $1,150 |
$12,760
527,257
kWh
|
- | - | - | - | |
02 | 2.2626: Avoid frost formation on evaporators | $6,712 | $2,000 |
$4,034
166,764
kWh
|
$2,678
-
kW-mo/yr
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $2,320 | $325 |
$2,320
95,838
kWh
|
- | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $4,979 | $13,870 |
$1,848
76,495
kWh
|
$3,131
-
kW-mo/yr
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $2,407 | $4,921 |
$2,407
99,355
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,821 | $509 |
$1,012
43,376
kWh
|
$809
-
kW-mo/yr
|
- | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $855 | $2,275 |
$855
31,946
kWh
|
- | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $466 | $1,060 |
$466
195,193
kWh
|
- | - | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $462 | $950 |
$234
9,672
kWh
|
$228
-
kW-mo/yr
|
- | - | - | |
10 | 2.2511: Insulate bare equipment | $246 | $893 |
$246
10,258
kWh
|
- | - | - | - | |
11 | 2.7261: Install timers and/or thermostats | $240 | $150 |
$240
9,965
kWh
|
- | - | - | - | |
12 | 2.8114: Change rate schedules or other changes in utility service | $6,740 | - | - | - | $6,740 | - | - | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,720 | - | - | - | - | - |
$1,720
-
lb
|
|
14 | 3.5131: Recycle white water | $12,464 | $2,930 | - | - | - |
$12,464
-
Tgal
|
- | |
15 | 4.322: Eliminate old stock and modify inventory control | $177,789 | $30,000 | - | - | - | - |
$177,789
-
lb
|
|
TOTAL RECOMMENDED | $231,981 | $61,033 |
$26,422
1,266,119
kWh
|
$6,846
-
kW-mo/yr
|
$6,740 |
$12,464
-
Tgal
|
$179,509
-
lb
|
||
TOTAL IMPLEMENTED | $205,495 | $51,068 |
$3,423
138,336
kWh
|
$3,359
-
kW-mo/yr
|
$6,740 |
$12,464
-
Tgal
|
$179,509
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs