ITAC Assessment: KG0014
ITAC logo
ITAC Assessment: KG0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pressure vessels,fractioning columns.
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 90,000
ft2
Annual Production 200
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $461,105 5,709,848
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $6,524 $2,150 $6,524
228,312
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,688 $829 $1,688
17,585
kWh
03 2.6231: Utilize controls to operate equipment only when needed $1,618 $3,000 $1,618
56,565
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,332 $15 $1,332
46,600
kWh
05 2.7135: Install occupancy sensors $80 $130 $80
2,931
kWh
TOTAL RECOMMENDED $11,242 $6,124 $11,242
351,993
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs