ITAC Assessment: MI0195
ITAC logo
ITAC Assessment: MI0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $5
M
to 10
M
# of Employees 165
Plant Area 206,000
ft2
Annual Production 230
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,706 2,147,720
kWh
Electricity Demand $65,625 9,687
kW-mo/yr
Electricity Fees $150,150 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $61,715 $106,284 $47,633
353,049
kWh
$14,082
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $50,578 $6,600 $39,045
289,221
kWh
$11,533
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,044 $1,210 $14,428
106,875
kWh
$1,616
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $8,854 $2,300 $6,834
50,612
kWh
$2,020
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,905 $40 $4,248
31,469
kWh
$1,657
-
kW-mo/yr
TOTAL RECOMMENDED $143,096 $116,434 $112,188
831,226
kWh
$30,908
-
kW-mo/yr
TOTAL IMPLEMENTED $81,381 $10,150 $64,555
478,177
kWh
$16,826
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs