ITAC Assessment: KG0005
ITAC logo
ITAC Assessment: KG0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Food Products
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area 169,000
ft2
Annual Production 58,125,000
lb
Production Hrs. Annual 4,940
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,887 8,847,597
kWh
Natural Gas $127,853 32,131
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $56,492 $1,260 $56,492
-
kWh
-
02 2.7261: Install timers and/or thermostats $6,211 $2,900 $6,211
205,158
kWh
-
03 2.4133: Use most efficient type of electric motors $16,505 $43,160 $16,505
353,458
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,345 $1,125 $4,345
67,116
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,042 $2,500 - $4,042
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,148 $465 $1,148
16,999
kWh
-
TOTAL RECOMMENDED $88,743 $51,410 $84,701
642,731
kWh
$4,042
-
MMBtu
TOTAL IMPLEMENTED $88,743 $51,410 $84,701
642,731
kWh
$4,042
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs