ITAC Assessment: OR0335
ITAC logo
ITAC Assessment: OR0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Semiconductors
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 40,000
ft2
Annual Production 40,611
pieces
Production Hrs. Annual 6,024
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,256 5,977,140
kWh
Electricity Demand $31,495 10,127
kW-mo/yr
Electricity Fees $10,067 -
Natural Gas $28,750 5,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $350,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.131: Modify process to reduce material use/cost $347,930 $644,800 $(-49,670.0)
(-1,461,313)
kWh
$(-9,050.0)
-
kW-mo/yr
- $(-19,050.0) $425,700
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,045 $1,000 $884
26,084
kWh
$161
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,260 - $1,066
31,360
kWh
$194
-
kW-mo/yr
- - -
04 3.6192: Use a less expensive method of waste removal $310 - - - $310
-
gal
- -
TOTAL RECOMMENDED $350,545 $645,800 $(-47,720.0)
(-1,403,869)
kWh
$(-8,695.0)
-
kW-mo/yr
$310
-
gal
$(-19,050.0) $425,700
TOTAL IMPLEMENTED $1,355 $1,000 $884
26,084
kWh
$161
-
kW-mo/yr
$310
-
gal
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs