ITAC Assessment: IP0177
ITAC logo
ITAC Assessment: IP0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Injection Molding
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 217
Plant Area 150,000
ft2
Annual Production 13,574,575
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $950,237 10,791,556
kWh
Electricity Demand $373,980 18,257
kW-mo/yr
Electricity Fees $96,933 -
Natural Gas $61,979 6,444
MMBtu
Waste Disposal Costs
Water Usage $18,972 2,637
Tgal
TOTAL YEARLY COSTS $1,502,101
RECOMMENDED SAVINGS* $564,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.6211: Conserve energy by efficient use of vending machines $431 - $327
3,714
kWh
$104
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,732 $210 $22,732
258,322
kWh
- - - -
03 2.2211: Use optimum temperature $10,080 - $2,442
27,749
kWh
- - $7,638
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,379 - $4,837
54,962
kWh
$1,542
-
kW-mo/yr
- - -
05 2.6231: Utilize controls to operate equipment only when needed $1,187 - $1,187
13,488
kWh
- - - -
06 2.8121: Apply for tax-free status for energy purchases $91,806 $8,000 - - $91,806 - -
07 2.4221: Install compressor air intakes in coolest locations $5,815 $653 $4,410
50,109
kWh
$1,405
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $1,228 $764 $1,228
13,956
kWh
- - - -
09 2.7241: Install outside air damper / economizer on hvac unit $2,101 $1,200 $2,101
23,880
kWh
- - - -
10 2.4239: Eliminate or reduce compressed air usage $4,349 $3,260 $4,349
49,421
kWh
- - - -
11 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $409,614 $304,570 $5,518
62,708
kWh
$4,096
-
kW-mo/yr
- - $400,000
12 2.7142: Utilize higher efficiency lamps and/or ballasts $8,714 $17,391 $6,748
76,683
kWh
$1,966
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $564,436 $336,048 $55,879
634,992
kWh
$9,113
-
kW-mo/yr
$91,806 $7,638
-
MMBtu
$400,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs