Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 308
Plant Area 440,000
ft2
Annual Production 54,182,368
units
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $738,723 15,268,801
kWh
Electricity Demand $545,995 34,642
kW-mo/yr
Electricity Fees $30,258 -
Natural Gas $214,375 71,539
MMBtu
Waste Disposal Costs
Water Usage $54,004 12,921
Tgal
TOTAL YEARLY COSTS $1,583,355
RECOMMENDED SAVINGS* $79,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $3,033 - $54
1,166
kWh
- $2,979
-
MMBtu
02 2.3132: Recharge batteries on during off-peak demand periods $18,240 - - $18,240
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $3,706 $517 $3,706
80,568
kWh
- -
04 2.7212: Install or upgrade insulation on hvac distribution systems $261 $38 $247
5,263
kWh
$15
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $4,539 $915 $2,677
58,200
kWh
$1,862
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $4,171 $1,316 $(-32.0)
(-692)
kWh
$(-24.0)
-
kW-mo/yr
$4,227
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,840 $69,000 $44,840
974,782
kWh
- -
08 2.7135: Install occupancy sensors $117 $499 $117
2,535
kWh
- -
09 2.7241: Install outside air damper / economizer on hvac unit $128 $600 $128
2,787
kWh
- -
TOTAL RECOMMENDED $79,035 $72,885 $51,736
1,124,609
kWh
$20,093
-
kW-mo/yr
$7,206
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs