Assessment Year | 2016 |
---|---|
Principal Product | Tool & Die |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
51,563
ft2
|
Annual Production | 303,000
lb
|
Production Hrs. Annual | 5,096
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,407 | 934,511 |
kWh
|
$0.064 |
Electricity Demand | $36,540 | 6,252 |
kW-mo/yr
|
$5.84 |
Electricity Fees | $1,650 | - |
|
- |
Natural Gas | $6,291 | 839 |
MMBtu
|
$7.50 |
TOTAL YEARLY COSTS | $103,888 | |||
RECOMMENDED SAVINGS* | $14,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $935 | - |
$830
13,052
kWh
|
$105
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $410 | $4 |
$337
5,306
kWh
|
$73
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,514 | $85 |
$2,066
32,490
kWh
|
$448
-
kW-mo/yr
|
|
04 | 2.4322: Use or replace with energy efficient substitutes | $4,720 | $671 |
$4,720
74,211
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $415 | $78 |
$415
6,523
kWh
|
- | |
06 | 2.7261: Install timers and/or thermostats | $1,837 | $555 |
$1,837
28,888
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $391 | $768 |
$347
5,453
kWh
|
$44
-
kW-mo/yr
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,378 | $6,703 |
$2,777
43,663
kWh
|
$601
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $14,600 | $8,864 |
$13,329
209,586
kWh
|
$1,271
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $14,600 | $8,864 |
$13,329
209,586
kWh
|
$1,271
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs