ITAC Assessment: IP0065
ITAC logo
ITAC Assessment: IP0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Metal Stamping
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466: Crowns and Closures
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 126,000
ft2
Annual Production 58,140
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,181 1,347,500
kWh
Electricity Demand $21,288 8,064
kW-mo/yr
Electricity Fees $240 -
Natural Gas $37,458 6,719
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,132 $8 $975
10,758
kWh
$157
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,539 $77 $1,539
16,969
kWh
- - -
03 2.7261: Install timers and/or thermostats $2,844 $181 $2,844
31,364
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $1,873 $422 $1,873
20,663
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $2,760 $93 $2,388
26,339
kWh
$372
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $483 $198 $416
4,591
kWh
$67
-
kW-mo/yr
- -
07 3.4151: Minimize water usage $9,506 $6,223 $(-888.0)
(-9,792)
kWh
$(-365.0)
-
kW-mo/yr
$1,799
-
MMBtu
$8,960
-
Tgal
08 2.7135: Install occupancy sensors $330 $293 $330
3,642
kWh
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $826 $840 $711
7,846
kWh
$115
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $519 $576 - - $519
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $9,693 $11,326 $9,565
105,497
kWh
$128
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $548 $957 $472
5,209
kWh
$76
-
kW-mo/yr
- -
TOTAL RECOMMENDED $32,053 $21,194 $20,225
223,086
kWh
$550
-
kW-mo/yr
$2,318
-
MMBtu
$8,960
-
Tgal
TOTAL IMPLEMENTED $21,698 $14,102 $20,783
229,236
kWh
$915
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs