Assessment Year | 2015 |
---|---|
Principal Product | Commercial Printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 36 |
Plant Area |
81,000
ft2
|
Annual Production | 4,651,194
lb
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $151,290 | 2,644,700 |
kWh
|
$0.057 |
Electricity Demand | $81,502 | 7,788 |
kW-mo/yr
|
$10.47 |
Electricity Fees | $4,469 | - |
|
- |
Natural Gas | $24,065 | 3,119 |
MMBtu
|
$7.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,775 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,927 | - | - |
$6,927
-
kW-mo/yr
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $3,405 | $163 |
$2,303
40,260
kWh
|
- | - |
$1,102
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,187 | $1,400 |
$3,187
55,708
kWh
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $666 | $543 |
$433
7,569
kWh
|
$233
-
kW-mo/yr
|
- | - | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $2,184 | $1,792 | - | - | - |
$2,184
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,242 | $4,203 |
$1,445
25,253
kWh
|
$797
-
kW-mo/yr
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,348 | $5,370 |
$1,348
23,558
kWh
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $10,314 | $19,140 | - | - | $10,314 | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,085 | $21,918 |
$185
3,235
kWh
|
- | - |
$4,900
-
MMBtu
|
|
TOTAL RECOMMENDED | $35,358 | $54,529 |
$8,901
155,583
kWh
|
$7,957
-
kW-mo/yr
|
$10,314 |
$8,186
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,775 | $11,679 |
$8,716
152,348
kWh
|
$7,957
-
kW-mo/yr
|
- |
$1,102
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs