ITAC Assessment: IP0041
ITAC logo
ITAC Assessment: IP0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 55,000
ft2
Annual Production 1,000
lb
Production Hrs. Annual 6,868
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,106 1,786,840
kWh
Electricity Demand $51,178 4,834
kW-mo/yr
Electricity Fees $1,646 -
Natural Gas $11,446 1,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,690 - $1,285
21,759
kWh
$404
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,360 - - $6,360
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,057 $167 $4,057
68,766
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $2,828 $665 $2,474
41,939
kWh
$354
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $10,659 $801 $10,659
180,661
kWh
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,713 $310 - - - $3,713
-
MMBtu
07 2.4234: Cool compressor air intake with heat exchanger $1,476 $340 - - - $1,476
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,278 $5,296 $3,647
61,813
kWh
$1,631
-
kW-mo/yr
- -
09 2.253: Infiltration $5,896 $5,317 $5,896
99,924
kWh
- - -
10 2.3212: Optimize plant power factor $1,104 $5,400 - - $1,104 -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $113 $385 $113
1,922
kWh
- - -
TOTAL RECOMMENDED $43,173 $18,680 $28,132
476,784
kWh
$8,749
-
kW-mo/yr
$1,104 $5,189
-
MMBtu
TOTAL IMPLEMENTED $9,448 $5,848 $7,818
132,501
kWh
$1,631
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs