ITAC Assessment: UD0034
ITAC logo
ITAC Assessment: UD0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MILK,CHEESE,ICE CREAM
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area
n/a
Annual Production 13,000
Tgal
Production Hrs. Annual 5,900
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,591 3,417,057
kWh
Natural Gas $53,155 14,266
MMBtu
Other Energy $161,000 17,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,098 $2,149 $3,098
71,219
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $851 - - $851
-
MMBtu
- -
03 2.2128: Use steam condensate for hot water supply (non-potable) $252 $100 $252
5,862
kWh
- - -
04 2.1335: Replace gasoline with diesel, lpg, or natural gas $46,072 $120,000 - - $(-114,928.0)
-
MMBtu
$161,000
-
MMBtu
05 2.7441: Replace broken windows and/or window sash $761 $400 - $761
-
MMBtu
- -
TOTAL RECOMMENDED $51,034 $122,649 $3,350
77,081
kWh
$1,612
-
MMBtu
$(-114,928.0)
-
MMBtu
$161,000
-
MMBtu
TOTAL IMPLEMENTED $851 - - $851
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs