| Assessment Year | 2026 |
|---|---|
| Principal Product | Steel Drums |
| NAICS | 332439: Other Metal Container Manufacturing |
| SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
| Sales Range | $10 M to 50M |
| # of Employees | 66 |
| Plant Area |
65,000
ft2
|
| Annual Production | 800,000
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $79,221 | 1,658,997 |
kWh
|
$0.048 | |
| Electricity Demand | $84,033 | 8,539 |
kW-mo/yr
|
$9.84 | |
| Electricity Fees | $52,089 | - |
|
- | |
| Natural Gas | $201,904 | 29,054 |
MMBtu
|
$6.95 | |
| Other Gas | $32,893 | 1 |
MMBtu
|
$32,893.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $84,889 | 7,162 |
Tgal
|
$11.85 | |
| TOTAL YEARLY COSTS | $535,029 | ||||
| RECOMMENDED SAVINGS* | $18,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $442 | - |
$318
6,774
kWh
|
$124
-
kW-mo/yr
|
- | |
| 02 | 2.2511: Insulate bare equipment | $2,377 | $458 | - | - |
$2,377
-
MMBtu
|
|
| 03 | 2.7135: Install occupancy sensors | $1,529 | $525 |
$380
8,088
kWh
|
$1,149
-
kW-mo/yr
|
- | |
| 04 | 2.7221: Lower temperature during the winter season and vice-versa | $357 | $850 |
$357
7,605
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $860 | $986 |
$309
6,565
kWh
|
$552
-
kW-mo/yr
|
- | |
| 06 | 2.7444: Close holes and openings in building such as broken windows | $5,977 | $29,536 | - | - |
$5,977
-
MMBtu
|
|
| 07 | 2.6218: Turn off equipment when not in use | $1,921 | $1,431 |
$1,823
38,792
kWh
|
$98
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,902 | $18,245 |
$2,408
51,236
kWh
|
$2,494
-
kW-mo/yr
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $235 | $1,669 |
$117
2,481
kWh
|
$119
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $18,601 | $53,700 |
$5,712
121,541
kWh
|
$4,535
-
kW-mo/yr
|
$8,354
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs